Sunday, August 22, 2010

We're Getting Closer!

It starting to feel like home everytime we visit. Maybe 15 Sep, we're hoping.
We're glad that allot of the trees were preserved; though there's lots of cleanup to be done.


I don't know why I'm so excited about having a well and our own water, just am.



By the time we come back the ceramic tiles will be down in the kitchen. So cool!


Crown mouldings are in place.


Tile work is started in the bathroom.





I thought septic systems were so simple, apparently not so much anymore. It goes into one tank, flows into a second, then is pumped uphill to our septic field, which I thought was cool as well.


The builder says they have people stop and ask about the house. They think it is the color; not a color that is seen a lot yet. The builder has used it on some of their bigger homes.


The septic drain fields--this times five.



I seem to have a natural affinity towards sanitation. This is my kingdom.

So, on the right it flows up from the pump station, then over to the distribution box, then out to the five drain fields with the perforated pipe and the gravel beds. Amazing, right?


1 comment:

Corley said...

the house looks great! i think the septic tanks are especially amazing!!:)